Quality & compliance

Every cord that leaves the plant has been electrically tested. That is the floor, not the ceiling: incoming material control, in-process inspection and batch traceability sit behind it.

Incoming material
01

Incoming material

Copper conductor resistance, insulation thickness, compound hardness and colour are checked against the mill certificate for every reel. Non-conforming reels are quarantined and returned, not re-graded.

In-process
02

In-process

First-off approval at each shift start, hourly dimensional checks on pin spacing and housing, and crimp pull-force monitoring on every cycle.

Final test
03

Final test

100 % hipot at 1 500 V AC / 1 s for Class II, 100 % earth continuity below 0,1 Ω for Class I, and polarity check on every piece. AQL 0,65 sampling on top.

Traceability
04

Traceability

Each carton carries a production order number that links back to the cable reel, tool, machine, operator shift and test record. Batch records are kept for five years.

Approvals for the markets you serve

CE
EU, low voltage and EMC directives
UKCA
Great Britain
VDE
Germany
ENEC
European electrical mark
UL / cUL
United States and Canada
CCC
China
PSE
Japan
KC
Korea
BSMI
Taiwan, China
SAA
Australia and New Zealand
SASO
Saudi Arabia
RoHS
Restricted substances

Tell us what you need to connect

Send a drawing, a sample or just a description. Our engineers reply with a feasibility assessment and indicative pricing within two working days.

Request a quote