
Tool design and mould making
In-house CAD/CAM, CNC machining, EDM and wire cutting. A new housing tool typically reaches first shot in 12–18 working days, and we keep every tool in our own store for the life of the programme.
Six processes, one site: tool design, injection moulding, cable processing, assembly, electrical test and packing. That vertical integration is what keeps lead times short and quality traceable.

In-house CAD/CAM, CNC machining, EDM and wire cutting. A new housing tool typically reaches first shot in 12–18 working days, and we keep every tool in our own store for the life of the programme.

Vertical and horizontal machines from 60 to 250 tonnes running flame-retardant PC, PA66 and PVC. In-line colour matching and automatic de-gating keep the cosmetic standard consistent across shifts.

Automatic cutting, stripping and terminal crimping with pull-force monitoring on every cycle. Crimp height and pull force data are logged against the production order.

Four lines running 24 hours, each with its own assembly supervisor and in-line electrical test station. Retail packaging, barcodes, manuals and private-label printing are handled on site.

Hipot, insulation resistance, earth continuity, polarity, pull force, bend and drop testing. Batch records are retained for five years and can be issued with shipments.
Drawing, sample or description in; feasibility, price and lead time out — usually within 48 hours.
3D modelling, DFM feedback, tool manufacture and first-shot samples.
Functional and safety samples with test reports for your sign-off.
Pre-production batch to validate fixtures, packaging and cycle time.
Scheduled lines with in-process inspection and daily output reporting.
AQL sampling, batch test records, export packing and documentation.
Send a drawing, a sample or just a description. Our engineers reply with a feasibility assessment and indicative pricing within two working days.